Suncor Energy Inc. - S22A-001
The purpose of this Project is to conduct abandonment and reclamation activities at Suncor's Tweed Lake M-47, Tweed Lake A-67, and Bele O-35 wellsites southwest and south of Colville Lake, Sahtu Region, Northwest Territories. The program area consists of three leases, access road, and a laydown area. Winter-only construction will be required for an 85 km access road linking the three well sites to Colville Lake. The project will include the following land-use operations:
· Field scouting using helicopter for water sources and other environmental data
· Surface casing vent flow, gas migration, and production casing pressure testing
· Construction of winter access road
· Transport of equipment to sites
· Remediation of impacts identified, as necessary
· Conducting downhole abandonment and cutting and capping of wellheads
· Water diversion and erosion control features, as required
· Selective seeding and/or tree planting of disturbed areas as required and/or approved
· Demobilization of equipment
Document | Received/Sent | Uploaded |
---|---|---|
S22A-001 + S22L1-001 - Amendment Cover Letter - Mar6_25.pdf (134.19 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S22A-001 + S22L1-001 - Suncor Letter to SLWB - Project Update and Conditions Satisfaction - Apr28_25.pdf (432.72 KB) | ||
S22A-001 + S22L1-001 - SLWB Response to Suncor - Project Update and Conditions Satisfaction - Apr29_25.pdf (86.71 KB) |